Who paved Atlas Peak Road, and how Napa paid for it
Supplier invoices identify the asphalt, timesheets identify the crew, and a later board award identifies the upper stretch of road and the money transferred to pave it.
Napa County crews logged paving work on Atlas Peak Road in 2018 and 2019. Seventeen Syar Industries invoices carried the Atlas Peak job description. Fifteen amounts total $174,257.23. Two entries transcribed from scans bring the provisional total to $214,706.25.
The year totals in the released analysis are $21,410.47 in 2018 and $193,295.78 in 2019. The amounts awaiting image confirmation are $20,154.41 on invoice 753436 and $20,294.61 on invoice 755310. Fifteen crew timesheets name Road 340 and identify paving or paving-box work. The milepost fields on the cited sheets are blank, so the sheets locate the work on the road without specifying each stretch.
Syar invoices coded to Atlas Peak1
Syar invoices coded to Atlas Peak
Invoice
Date
Amount
Reading
683661
Apr 17, 2018
$10,145.51
Amount as transcribed from claim
694897
Jul 10, 2018
$11,264.96
Amount as transcribed from claim
749914
Sep 26, 2019
$456.86
Amount as transcribed from claim
750042
Sep 26, 2019
$12,844.51
Amount as transcribed from claim
750234
Sep 27, 2019
$13,521.46
Amount as transcribed from claim
753436
Oct 2, 2019
$20,154.41
Scan transcription, amount unconfirmed
753647
Oct 22, 2019
$19,835.53
Amount as transcribed from claim
753927
Oct 23, 2019
$12,959.93
Amount as transcribed from claim
754058
Oct 24, 2019
$19,290.81
Amount as transcribed from claim
754298
Oct 25, 2019
$9,181.53
Amount as transcribed from claim
754935
Oct 31, 2019
$482.30
Amount as transcribed from claim
755101
Nov 1, 2019
$156.98
Amount as transcribed from claim
755302
Nov 4, 2019
$221.09
Amount as transcribed from claim
755310
Nov 4, 2019
$20,294.61
Scan transcription, amount unconfirmed
756179
Nov 4, 2019
$19,437.40
Amount as transcribed from claim
755688
Nov 6, 2019
$24,961.11
Amount as transcribed from claim
756009
Nov 7, 2019
$19,497.25
Amount as transcribed from claim
The 2023 contract covered a defined 2.7 miles
The later East Central Paving project had three phases. County awards totaled $6,841,558 across Argonaut Constructors, O.C. Jones and Martin Brothers Construction. In June 2023 the county awarded Martin Brothers $1,305,728 for Phase Three, the final stretch to the cul-de-sac. Total project cost was $1,636,587.
The budget transferred $483,229 from the Calistoga Area Paving Project and $423,358 from accumulated capital outlay. Together those amounts make $906,587. Approximately $730,000 remained available from the PG&E settlement for the upper-road project.
The June 27 consent vote was unanimous, with Cottrell, Gallagher, Gregory, Pedroza and Ramos voting yes. The specifications include geotechnical photographs near 4110 Atlas Peak, which the Pedrozas later acquired on April 18, 2025. The purchase followed the vote by almost two years.
The December 14, 2023 federal subpoena listed Atlas Peak paving first. The invoices, timesheets and Phase Three contract answer separate questions about the material bought, the labor performed and the later work authorized.
Timesheets and related road contracts2
The 2018 claims were coded to Syar vendor 17242, Fund 2040 and account 53360. The road-crew sheets record paving-box work in April 2018 and overtime on October 21–22, 2019. They do not supply delivery points for each invoice.
Other files in the county production concern the RDS 20-44 LNU fire debris contract, a $697,760 low bid, an Argonaut asphalt overage change order for $67,974.38 and striping contracts RDS 21-27 and 22-02. Their inclusion in one archive does not make them all Phase Three costs.
How the three paving awards fit together2
The county received $33,954,044 in the PG&E settlement and allocated $16 million for roads on July 28, 2020. East Central Paving project 21067 covered multiple roads and contracts. On August 10, 2021, the board awarded Argonaut Constructors $3,297,296, with Pedroza serving as board chair and signing officer. O.C. Jones received $2,238,534 on June 7, 2022. Martin Brothers received $1,305,728 on June 27, 2023. Those three awards add to $6,841,558.
The 2018–19 Syar invoices predate that settlement allocation. They document materials coded to Atlas Peak. The later Phase Three contract specifies the upper-road limits. These dates and descriptions keep the earlier material purchases distinct from the later capital project.
{
"schema": "http://ops.miscsubjects.com/schemas/jarticle.json",
"status": "published",
"slug": "pedroza-atlas-peak-road-paving",
"title": "Who paved Atlas Peak Road, and how Napa paid for it",
"summary": "Supplier invoices identify the asphalt, timesheets identify the crew, and a later board award identifies the upper stretch of road and the money transferred to pave it.",
"hero": "https://d8j0ntlcm91z4.cloudfront.net/user_3L26cmpQHp0gP546WGcwSwbTylp/hf_20261119_045702_1f878e39-2b03-41e9-9d21-0a287568c250.png",
"hero_alt": "Editorial illustration of steamroller laying a fresh black strip on a twisting rural hillside road, close crop, copper morning light.",
"hero_caption": "Editorial illustration by Higgsfield.",
"layout": "item",
"kind": "investigation",
"listed": true,
"tags": [
"Napa County",
"Alfredo Pedroza",
"The Pedroza Record"
],
"sources": [
{
"id": "roadArchive",
"title": "Atlas Peak invoices, crew timesheets and contracts",
"publisher": "Napa County records release, 26-1527",
"url": "https://countyofnapa.nextrequest.com/requests/26-1527",
"location": "Released November 18, 2026. Document 74294595. Archive 24-90, road 340, 2018–19 and RDS 21-25C. The county limits online access to the requester.",
"source_type": "government",
"document_id": "74294595",
"request_id": "26-1527",
"access": "requester release",
"summary": "Released November 18, 2026. Document 74294595. Archive 24-90, road 340, 2018–19 and RDS 21-25C. The county limits online access to the requester."
},
{
"id": "roadAward",
"title": "Award of East Central Paving Project, Phase Three",
"url": "https://napa.legistar.com/LegislationDetail.aspx?ID=6335670&GUID=469CA789-80A4-44C9-833D-3B36A53B0681",
"location": "June 27, 2023, 23-1135, RDS 21-25C.",
"publisher": "Napa County Board of Supervisors",
"source_type": "government",
"summary": "June 27, 2023, 23-1135, RDS 21-25C."
},
{
"id": "roadBudget",
"title": "East Central Paving Phase Three budget",
"publisher": "Napa County Public Works",
"url": "https://napa.legistar1.com/napa/attachments/ce031ece-dda1-4c50-811a-76e70da0b65d.pdf",
"location": "Budget Summary attached to file 23-1135.",
"source_type": "government",
"summary": "Budget Summary attached to file 23-1135."
},
{
"id": "roadMinutes",
"title": "Board minutes, June 27, 2023",
"url": "https://napa.legistar.com/View.ashx?M=M&ID=1008038&GUID=6D095261-A733-44CC-B3A5-6329E3991FBB&G=F04B971E-D758-4DCE-9A94-5E774824527E",
"location": "Consent calendar vote and item AV, 23-1135.",
"publisher": "Napa County Board of Supervisors",
"source_type": "government",
"summary": "Consent calendar vote and item AV, 23-1135."
}
],
"body": [
"Napa County crews logged paving work on Atlas Peak Road in 2018 and 2019. Seventeen Syar Industries invoices carried the Atlas Peak job description. Fifteen amounts total $174,257.23. Two entries transcribed from scans bring the provisional total to $214,706.25.",
{
"type": "source",
"id": "roadArchive"
},
"The year totals in the released analysis are $21,410.47 in 2018 and $193,295.78 in 2019. The amounts awaiting image confirmation are $20,154.41 on invoice 753436 and $20,294.61 on invoice 755310. Fifteen crew timesheets name Road 340 and identify paving or paving-box work. The milepost fields on the cited sheets are blank, so the sheets locate the work on the road without specifying each stretch.",
{
"type": "group",
"title": "Syar invoices coded to Atlas Peak",
"items": [
{
"type": "table",
"title": "Syar invoices coded to Atlas Peak",
"rows": [
{
"Invoice": "683661",
"Date": "Apr 17, 2018",
"Amount": "$10,145.51",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "694897",
"Date": "Jul 10, 2018",
"Amount": "$11,264.96",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "749914",
"Date": "Sep 26, 2019",
"Amount": "$456.86",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "750042",
"Date": "Sep 26, 2019",
"Amount": "$12,844.51",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "750234",
"Date": "Sep 27, 2019",
"Amount": "$13,521.46",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "753436",
"Date": "Oct 2, 2019",
"Amount": "$20,154.41",
"Reading": "Scan transcription, amount unconfirmed"
},
{
"Invoice": "753647",
"Date": "Oct 22, 2019",
"Amount": "$19,835.53",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "753927",
"Date": "Oct 23, 2019",
"Amount": "$12,959.93",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "754058",
"Date": "Oct 24, 2019",
"Amount": "$19,290.81",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "754298",
"Date": "Oct 25, 2019",
"Amount": "$9,181.53",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "754935",
"Date": "Oct 31, 2019",
"Amount": "$482.30",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "755101",
"Date": "Nov 1, 2019",
"Amount": "$156.98",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "755302",
"Date": "Nov 4, 2019",
"Amount": "$221.09",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "755310",
"Date": "Nov 4, 2019",
"Amount": "$20,294.61",
"Reading": "Scan transcription, amount unconfirmed"
},
{
"Invoice": "756179",
"Date": "Nov 4, 2019",
"Amount": "$19,437.40",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "755688",
"Date": "Nov 6, 2019",
"Amount": "$24,961.11",
"Reading": "Amount as transcribed from claim"
},
{
"Invoice": "756009",
"Date": "Nov 7, 2019",
"Amount": "$19,497.25",
"Reading": "Amount as transcribed from claim"
}
]
}
]
},
"## The 2023 contract covered a defined 2.7 miles",
"The later East Central Paving project had three phases. County awards totaled $6,841,558 across Argonaut Constructors, O.C. Jones and Martin Brothers Construction. In June 2023 the county awarded Martin Brothers $1,305,728 for Phase Three, the final stretch to the cul-de-sac. Total project cost was $1,636,587.",
{
"type": "source",
"id": "roadAward"
},
"The budget transferred $483,229 from the Calistoga Area Paving Project and $423,358 from accumulated capital outlay. Together those amounts make $906,587. Approximately $730,000 remained available from the PG&E settlement for the upper-road project.",
{
"type": "source",
"id": "roadBudget"
},
"The June 27 consent vote was unanimous, with Cottrell, Gallagher, Gregory, Pedroza and Ramos voting yes. The specifications include geotechnical photographs near 4110 Atlas Peak, which the Pedrozas later acquired on April 18, 2025. The purchase followed the vote by almost two years.",
{
"type": "source",
"id": "roadMinutes"
},
"The December 14, 2023 federal subpoena listed Atlas Peak paving first. The invoices, timesheets and Phase Three contract answer separate questions about the material bought, the labor performed and the later work authorized.",
{
"type": "group",
"title": "Timesheets and related road contracts",
"items": [
"The 2018 claims were coded to Syar vendor 17242, Fund 2040 and account 53360. The road-crew sheets record paving-box work in April 2018 and overtime on October 21–22, 2019. They do not supply delivery points for each invoice.",
"Other files in the county production concern the RDS 20-44 LNU fire debris contract, a $697,760 low bid, an Argonaut asphalt overage change order for $67,974.38 and striping contracts RDS 21-27 and 22-02. Their inclusion in one archive does not make them all Phase Three costs."
]
},
{
"type": "group",
"title": "How the three paving awards fit together",
"items": [
"The county received $33,954,044 in the PG&E settlement and allocated $16 million for roads on July 28, 2020. East Central Paving project 21067 covered multiple roads and contracts. On August 10, 2021, the board awarded Argonaut Constructors $3,297,296, with Pedroza serving as board chair and signing officer. O.C. Jones received $2,238,534 on June 7, 2022. Martin Brothers received $1,305,728 on June 27, 2023. Those three awards add to $6,841,558.",
"The 2018–19 Syar invoices predate that settlement allocation. They document materials coded to Atlas Peak. The later Phase Three contract specifies the upper-road limits. These dates and descriptions keep the earlier material purchases distinct from the later capital project."
]
},
"## Related reporting",
"[Syar-linked companies gave to Pedroza before and after a quarry vote](/a/pedroza-syar-quarry-vote)",
"[Two federal subpoenas ten days apart asked Napa for two different sets of records](/a/pedroza-federal-subpoenas)",
"[How the 4110 Atlas Peak purchase led back to Vinedos](/a/pedroza-atlas-peak-loan-rollover)",
"[All In: The Pedroza Record — complete series and reference tables](/a/all-in-the-pedroza-record)"
],
"type": "article",
"created": "2026-11-19T05:26:37.384Z",
"updated": "2026-11-19T09:10:58.872Z",
"published_at": "2026-11-19T05:26:37.384Z",
"version": 4,
"hash": "125891faf1bcb6266a5c99e393fb5a0e7f57f5453fbf96f3d94c94b853af88d0",
"theme": "http://ops.miscsubjects.com/article-theme.json",
"styling": {
"scope": "shared",
"theme_ref": "http://ops.miscsubjects.com/article-theme.json"
},
"page": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving",
"json": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving.json",
"markdown": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving.md",
"calls": [
{
"what": "this article as a page (no key)",
"method": "GET",
"url": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving",
"headers": {}
},
{
"what": "this article as its object (no key)",
"method": "GET",
"url": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving.json",
"headers": {}
},
{
"what": "this article as Markdown (no key)",
"method": "GET",
"url": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving.md",
"headers": {}
},
{
"what": "the object with its hash, drafts too",
"method": "GET",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>"
}
},
{
"what": "one piece and that piece’s hash",
"method": "GET",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving/at?path=facts",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>"
}
},
{
"what": "grep: every key or value that matches, with the path to change it",
"method": "GET",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving/grep?q=owner",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>"
}
},
{
"what": "change pieces (set, merge, delete, append, insert, move); if-match is the hash",
"method": "PATCH",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>",
"content-type": "application/json",
"if-match": "<hash from the read>"
},
"body": {
"ops": [
{
"op": "set",
"path": "facts.example",
"value": 1
}
]
}
},
{
"what": "replace the whole object",
"method": "PUT",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>",
"content-type": "application/json",
"if-match": "<hash>"
},
"body": {
"slug": "pedroza-atlas-peak-road-paving",
"title": "…"
}
},
{
"what": "fetch every source, hash what came back and check the quote is in it",
"method": "POST",
"url": "http://ops.miscsubjects.com/api/jarticles/pedroza-atlas-peak-road-paving/verify",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>",
"content-type": "application/json"
},
"body": {}
},
{
"what": "an Obsidian-style command",
"method": "POST",
"url": "http://ops.miscsubjects.com/api/jarticles/cli",
"headers": {
"x-terminal-key": "<YOUR_TERMINAL_KEY>",
"content-type": "application/json"
},
"body": {
"command": "backlinks",
"file": "pedroza-atlas-peak-road-paving"
}
}
],
"entities": {
"pedroza-atlas-peak-road-paving": {
"id": "pedroza-atlas-peak-road-paving",
"label": "Who paved Atlas Peak Road, and how Napa paid for it",
"type": "investigation",
"page": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving",
"json": "http://ops.miscsubjects.com/a/pedroza-atlas-peak-road-paving.json"
}
},
"relationships": {
"upward": {
"total": 0,
"offset": 0,
"limit": 50,
"items": [],
"next": null
},
"downward": {
"total": 0,
"offset": 0,
"limit": 50,
"items": [],
"next": null
},
"sideways": {
"total": 0,
"offset": 0,
"limit": 50,
"items": [],
"next": null
},
"references": {
"total": 0,
"offset": 0,
"limit": 50,
"items": [],
"next": null
},
"referenced_by": {
"total": 0,
"offset": 0,
"limit": 50,
"items": [],
"next": null
}
},
"hierarchy": {
"paths": [],
"order": "subject to parent to ancestor",
"complete": true,
"cycles": [],
"limits": {
"depth": 12,
"objects": 250
},
"unresolved_refs": []
},
"reference_contract": {
"canonical_id": "slug",
"entity_lookup": "entities[ref]; # resolves to this object via self_ref",
"self_ref": "pedroza-atlas-peak-road-paving",
"entity_fields": "page and json are canonical object links; source_url is the external source",
"directions": {
"upward": "Parents and collections containing this object; predicate distinguishes location from membership.",
"downward": "Objects naming this object as their parent, container or collection.",
"sideways": "Associations and objects sharing a direct parent.",
"references": "Objects referenced by this record.",
"referenced_by": "Published articles referencing this record."
},
"predicates": {
"part_of": "Declared parent hierarchy.",
"located_in": "Location asserted on this object.",
"associated_parcel": "Associated parcel, a separate object with its own jurisdiction and facts.",
"member_of": "Collection membership, not geographic containment.",
"included_in": "Editorial nesting, not geographic containment.",
"shares_parent": "Shares the identified parent; no other relationship is implied.",
"related_to": "An association with no more specific predicate recorded."
},
"scope": "Published article objects; Atlas inventories have their own counted, paged links. An association does not transfer facts or jurisdiction. An absent neighborhood means no neighborhood relationship is recorded."
},
"hash_spec": {
"algorithm": "sha256",
"encoding": "lowercase hexadecimal",
"scope": "stored record; hash is also the write concurrency token",
"included_keys": [
"body",
"created",
"hero",
"hero_alt",
"hero_caption",
"kind",
"layout",
"listed",
"published_at",
"schema",
"slug",
"sources",
"status",
"summary",
"tags",
"title",
"type",
"updated",
"version"
],
"field_overrides": {
"schema": "jarticle/1"
},
"canonicalization": "Select included_keys from this response, apply field_overrides, recursively sort object keys using JavaScript Object.keys().sort(), retain array order, serialize primitives with JSON.stringify, join without whitespace, hash UTF-8 bytes.",
"updated_included": true,
"generated_fields": "All fields absent from included_keys are excluded. Relationship counts and theme references are generated and can change without changing the stored-record hash."
}
}