MiscSubjects

cfl_rates_2026_continuity

fact

Clover Flat rates effective 2026-07-01 as published: refuse $148/ton (minimum $145), mixed C&D $148/ton, clean wood $160/ton, clean green $160/ton, treated wood $232/ton, clean concrete/asphalt $117/ton — identical headline rates to the operator-published schedule carried in round 1

Clover Flat rates effective 2026-07-01 as published: refuse $148/ton (minimum $145), mixed C&D $148/ton, clean wood $160/ton, clean green $160/ton, treated wood $232/ton, clean concrete/asphalt $117/ton — identical headline rates to the operator-published schedule carried in round 1

Date
2026-07-01
Evidence
PRIMARY-COUNTY-SCHEDULE
ID
fact:R2EAUD-00002
SHA-256
8e1aa137de0166aed70eb8364b5c2518c647bd9dffc76539154059eb44cbfc3b
Source
www.countyofnapa.org/DocumentCenter/View/3109/CFL-Rates-Eff-07-01-24-PDF%20|%20Rates%20Effective%2007/01/26%20table%20(county%20DocumentCenter%20copy%20surfaced%202026-11-16)
Record fields
id
fact:R2EAUD-00002
type
fact
name
cfl_rates_2026_continuity
visibility
public
predicate
cfl_rates_2026_continuity
subject
org:waste-connections
text
Clover Flat rates effective 2026-07-01 as published: refuse $148/ton (minimum $145), mixed C&D $148/ton, clean wood $160/ton, clean green $160/ton, treated wood $232/ton, clean concrete/asphalt $117/ton — identical headline rates to the operator-published schedule carried in round 1
quote
Clover Flat rates effective 2026-07-01 as published: refuse $148/ton (minimum $145), mixed C&D $148/ton, clean wood $160/ton, clean green $160/ton, treated wood $232/ton, clean concrete/asphalt $117/ton — identical headline rates to the operator-published schedule carried in round 1
src
https://www.countyofnapa.org/DocumentCenter/View/3109/CFL-Rates-Eff-07-01-24-PDF | Rates Effective 07/01/26 table (county DocumentCenter copy surfaced 2026-11-16)
observed at
2026-07-01
evidence status
PRIMARY-COUNTY-SCHEDULE
value
7 fields
id
R2EAUD-00002
subject
org:waste-connections
predicate
cfl_rates_2026_continuity
object
Clover Flat rates effective 2026-07-01 as published: refuse $148/ton (minimum $145), mixed C&D $148/ton, clean wood $160/ton, clean green $160/ton, treated wood $232/ton, clean concrete/asphalt $117/ton — identical headline rates to the operator-published schedule carried in round 1
date
2026-07-01
grade
PRIMARY-COUNTY-SCHEDULE
provenance
1 items
  1. source id
    document:napa-working-graph:2026-11-18:bf4d4b449b7a2f09
    locator
    facts.jsonl:10838
    source sha256
    62a33402fec112c03f67ee1f371b280b7a8ffd9912bd9218517bd2229be00ce0
graph contract
https://api.miscsubjects.com/graph/pedroza.json
canonical aliases
0 items[]
hash
8e1aa137de0166aed70eb8364b5c2518c647bd9dffc76539154059eb44cbfc3b
json
fact:R2EAUD-00002
page
fact:R2EAUD-00002
Graph canvas

Related records

1 matching relationships · 1–1