Vine Transit Maintenance Facility - construction contract and TIFIA/bank financing approved (NVTA)

decision

ID
decision-2021-vine-transit-maintenance-facility
SHA-256
2ba31d1da7c69d6e374b8f4f51be1471eda174544ce03db1bd1e125bf8034010
Record fields
id
decision-2021-vine-transit-maintenance-facility
kind
decision
name
Vine Transit Maintenance Facility - construction contract and TIFIA/bank financing approved (NVTA)
degree
1
props
8 fields
date
2021-11-23
value basis
NVTA: $39M facility, came in nearly $1M under budget; NVTA Feb 2022 update: total project cost $40.65M, construction $35.747M; built by Alten Construction LLC, designed by Stantec; one of only three projects in the U.S. to receive a TIFIA Rural Project Initiative loan
process basis
NVTA update records 'TIFIA Loan, Bank Loan, and Construction Contract approved on Nov. 23, 2021.' How Alten Construction was selected (bid competition, number of bidders) is UNVERIFIED in fetched sources - the financing structure (federal TIFIA loan + bank loan) was arranged alongside the contract, a discretionary package rather than a documented low-bid award
priority score
50
edges
2 items
  1. rel
    awarded_to
    to
    company-alten-construction-llc
  2. rel
    decided_by
    to
    agency-nvta
verification
partially_verified
population file
population/06-airport-infrastructure.jsonl
type
decision
visibility
public
provenance
1 items
  1. source id
    document:napa-working-graph:2026-11-18:bf4d4b449b7a2f09
    locator
    objects.jsonl:1511
    source sha256
    3f7ad1835fd44f3c944f251e91162e851fa257011092aa29f42c0cc140af2f3e
graph contract
https://api.miscsubjects.com/graph/pedroza.json
canonical aliases
0 items[]
hash
2ba31d1da7c69d6e374b8f4f51be1471eda174544ce03db1bd1e125bf8034010
json
decision-2021-vine-transit-maintenance-facility
page
decision-2021-vine-transit-maintenance-facility
Graph canvas

Related records

4 matching relationships · 1–4