Pedroza voted yes on the Regional Measure 3 package that included Vine Transit Maintenance Facility and State Route 29 Soscol Junction. The approximately $271.6
fact
Pedroza voted yes on the Regional Measure 3 package that included Vine Transit Maintenance Facility and State Route 29 Soscol Junction. The approximately $271.6 million was the package total, not the award to those two projects.
Soscol Junction
- Date
- 2026-11-11T11:50:56.479Z
- Evidence
- verified primary record
- ID
- fact:0facda3686c1a9ee
- SHA-256
a0b513f61f36124196c89da0c908067696efeb14e36b9fe335f6cd117a83c14e
Record fields
- id
- fact:0facda3686c1a9ee
- type
- fact
- subject
- ENT-PERSON-PEDROZA
- predicate
- participation
- text
- Pedroza voted yes on the Regional Measure 3 package that included Vine Transit Maintenance Facility and State Route 29 Soscol Junction. The approximately $271.6 million was the package total, not the award to those two projects.
- quote
- Soscol Junction
- source ids
1 items
- doc:ea7d534595471e987106718c81632a01e409cdf4a6c0629e60d8222ae38522b5
- locator
- Regional Measure 3 allocation action and attachments
- source date
- 2023-06-28
- observed at
- 2026-11-11T11:50:56.479Z
- evidence status
- verified_primary_record
- provenance
1 items
- source id
- source:gmail:attachment:1a1ca729722a9946
- locator
- records/fact:0facda3686c1a9ee
- source versions
1 fields
- person-export-2026-11-11.1
- sha256:7b9a3f23a305d8c82e14334e8a45f4b02cfa11fc617a0640ad3b9e0232d0d84f
- name
- Pedroza voted yes on the Regional Measure 3 package that included Vine Transit Maintenance Facility and State Route 29 Soscol Junction. The approximately $271.6
- visibility
- public
- graph contract
- https://api.miscsubjects.com/graph/pedroza.json
- canonical aliases
0 items
[]- hash
- a0b513f61f36124196c89da0c908067696efeb14e36b9fe335f6cd117a83c14e
Related records
6 matching relationships · 1–6
Alfredo Pedrozaabout · outgoing
persondocument
document
graph
article
Source content 7b9a3f23a305source content · outgoing
source content